Nevada Highways; Roads; Bridges; Parks
Sec. § 408.3882
Procedure for selecting design-build team.


If the Department desires to contract with a design-build team pursuant to NRS 408.388 and 408.3881, the Department must select the design-build team in accordance with NRS 408.3883 to 408.3886, inclusive.
Source
Last accessed
Nov. 20, 2019