NRS 543.5955
Annual review of master plan

  • annual report by board.

1.

The board shall direct its chief engineer and general manager to prepare an annual review of the master plan for consideration by the board. The review must include consideration of:

(a)

Growth and development in the district;

(b)

The cost of and progress in construction of facilities for the control of floods;

(c)

The district’s uniform code for management of a floodplain and the development of standards for construction of facilities for the control of floods;

(d)

Progress in the development of facilities by the United States Army Corps of Engineers; and

(e)

The establishment of additional long-range priorities for the control of floods.

2.

The board shall prepare an annual report in conjunction with its review. The report must set forth:

(a)

The source and amount of money received during the previous year;

(b)

The amount of money expended during the previous year;

(c)

A listing of any project completed during the previous year;

(d)

A listing of any project under construction;

(e)

A listing of any project which is proposed for the ensuing year and the time estimated for its completion;

(f)

The amount of money expended during the previous year for the operation and maintenance of facilities for the control of floods; and

(g)

Any recommended amendments of the master plan.

3.

A copy of the report must be filed with the district’s chief engineer. A copy must be provided to any person upon request for a fee which does not exceed the actual cost of printing and mailing the report.

Source: Section 543.5955 — Annual review of master plan; annual report by board., https://www.­leg.­state.­nv.­us/NRS/NRS-543.­html#NRS543Sec5955.

543.320
Board of county commissioners or regional transportation commission constitutes board of directors.
543.330
District officers: Designation and selection
543.340
Meetings
543.355
Citizens’ advisory committee: Creation
543.360
Acquisition, construction and operation of projects and improvements
543.362
Project may consist of any interest in property.
543.365
Aesthetic enhancement of projects.
543.368
Location of improvement along or across public road or highway.
543.370
Perpetual existence of board.
543.380
Corporate seal.
543.390
Suits, actions and proceedings.
543.400
Acquisition, improvement and disposal of property.
543.410
Storage and reclamation of floodwater
543.420
Eminent domain.
543.430
Acquired water to be used only in replenishing water basin.
543.440
Use of property taken by eminent domain declared public use
543.450
Surveys
543.460
Investigations, studies and research
543.470
Operation, maintenance and repair of improvements.
543.480
Contracts
543.490
Borrowing money
543.500
Acquisition and disposal of and encumbrances on property.
543.510
Appointment and powers of chief engineer and general manager
543.520
Bylaws.
543.530
Implied powers.
543.540
Agreements concerning projects for control of floods.
543.545
Exemption from requirements of public bidding for construction of certain flood control facilities
543.547
Compliance with master plan required for construction of flood control facility by local government
543.550
Rights-of-way across public lands granted to districts.
543.560
Acquisition of right to flood or interfere with property
543.570
Connection with storm water drain or flood control facility: Application
543.580
Chief engineer and general manager: Investigations, reports and estimates
543.590
Survey and report of problems
543.595
Adoption of uniform regulations
543.596
Further review of master plan at 5-year intervals.
543.597
Change of facility on or amendment of master plan
543.5955
Annual review of master plan
543.5965
More frequent review of master plan authorized
543.5975
Amendment of master plan for expenditure or provision of money to protect public or private property from flooding.
Last Updated

Jun. 24, 2021

§ 543.5955’s source at nv​.us