NRS 543.580
Chief engineer and general manager: Investigations, reports and estimates

  • recommendations
  • employment of engineers and surveyors.

1.

The chief engineer and general manager may investigate carefully the best plan or plans:

(a)

To control the floodwaters of the district and the floodwaters of streams that have their sources outside of the district but flow into the district;

(b)

To conserve those waters for beneficial and useful purposes by spreading, storing, retaining, or causing to percolate into the soil within or without the district, or to save or conserve in any manner, any of those waters; and

(c)

To protect the watercourses, watersheds, public highways, life and property in the district from damage from that water,
Ê and to obtain such other information in regard thereto as may be deemed necessary or useful in carrying out the purposes of NRS 543.170 to 543.830, inclusive.

2.

The chief engineer and general manager shall make and file reports from time to time with the board, which must show:

(a)

A general description of the work to be done on each project or work of improvement.

(b)

General plans, profiles, cross sections and other general specifications of the work to be done on each project or work of improvement.

(c)

A general description of the lands, rights-of-way, easements and property proposed to be taken, acquired or injured in the carrying out of that work.

(d)

An estimate of the cost of each project or work of improvement including:

(1)

An estimate of the costs of lands, rights-of-way, easements and property proposed to be taken, acquired or injured in carrying out the project or work of improvement.

(2)

An estimate of all incidental expenses likely to be incurred in connection therewith, including legal, clerical, engineering, superintendence, inspection, printing and advertising, and stating the total amount of bonds, if any, necessary to be issued to pay for it.

(3)

A comparison of the total cost of the proposed works with an estimate of the cost of condemnation and relocation or replacement of property within the boundaries of the floodplain.

3.

The chief engineer and general manager shall, from time to time, as directed by the board, file with the board supplementary, amendatory and additional reports and recommendations as necessity and convenience may require.

4.

The chief engineer and general manager may, subject to the control and direction of the board, employ other engineers, surveyors and other persons required for making all surveys and doing any work necessary for the making of the reports.

Source: Section 543.580 — Chief engineer and general manager: Investigations, reports and estimates; recommendations; employment of engineers and surveyors., https://www.­leg.­state.­nv.­us/NRS/NRS-543.­html#NRS543Sec580 (accessed May 26, 2025).

543.320
Board of county commissioners or regional transportation commission constitutes board of directors.
543.330
District officers: Designation and selection
543.340
Meetings
543.355
Citizens’ advisory committee: Creation
543.360
Acquisition, construction and operation of projects and improvements
543.362
Project may consist of any interest in property.
543.365
Aesthetic enhancement of projects.
543.368
Location of improvement along or across public road or highway.
543.370
Perpetual existence of board.
543.380
Corporate seal.
543.390
Suits, actions and proceedings.
543.400
Acquisition, improvement and disposal of property.
543.410
Storage and reclamation of floodwater
543.420
Eminent domain.
543.430
Acquired water to be used only in replenishing water basin.
543.440
Use of property taken by eminent domain declared public use
543.450
Surveys
543.460
Investigations, studies and research
543.470
Operation, maintenance and repair of improvements.
543.480
Contracts
543.490
Borrowing money
543.500
Acquisition and disposal of and encumbrances on property.
543.510
Appointment and powers of chief engineer and general manager
543.520
Bylaws.
543.530
Implied powers.
543.540
Agreements concerning projects for control of floods.
543.545
Exemption from requirements of public bidding for construction of certain flood control facilities
543.547
Compliance with master plan required for construction of flood control facility by local government
543.550
Rights-of-way across public lands granted to districts.
543.560
Acquisition of right to flood or interfere with property
543.570
Connection with storm water drain or flood control facility: Application
543.580
Chief engineer and general manager: Investigations, reports and estimates
543.590
Survey and report of problems
543.595
Adoption of uniform regulations
543.596
Further review of master plan at 5-year intervals.
543.597
Change of facility on or amendment of master plan
543.5955
Annual review of master plan
543.5965
More frequent review of master plan authorized
543.5975
Amendment of master plan for expenditure or provision of money to protect public or private property from flooding.

May 26, 2025

§ 543.580. Chief engineer & general manager: Investigations, reports and estimates's source at nv​.us