NRS 543.570
Connection with storm water drain or flood control facility: Application

  • fee
  • penalty.

1.

Any person desiring to make a connection to any storm water drain or flood control facility of the district or to cause storm waters to be emptied into any ditch, drain, canal, floodway or other appurtenant structure of the district shall first make application to the board to make the connection. The board may require the connection to be made in such manner as it may direct and may impose such reasonable connection fees as it deems proper, or, if reasonably justified by the circumstances, may refuse permission.

2.

Any person making a connection or causing floodwaters to be so discharged without first having obtained permission is guilty of a misdemeanor.

Source: Section 543.570 — Connection with storm water drain or flood control facility: Application; fee; penalty., https://www.­leg.­state.­nv.­us/NRS/NRS-543.­html#NRS543Sec570.

543.320
Board of county commissioners or regional transportation commission constitutes board of directors.
543.330
District officers: Designation and selection
543.340
Meetings
543.355
Citizens’ advisory committee: Creation
543.360
Acquisition, construction and operation of projects and improvements
543.362
Project may consist of any interest in property.
543.365
Aesthetic enhancement of projects.
543.368
Location of improvement along or across public road or highway.
543.370
Perpetual existence of board.
543.380
Corporate seal.
543.390
Suits, actions and proceedings.
543.400
Acquisition, improvement and disposal of property.
543.410
Storage and reclamation of floodwater
543.420
Eminent domain.
543.430
Acquired water to be used only in replenishing water basin.
543.440
Use of property taken by eminent domain declared public use
543.450
Surveys
543.460
Investigations, studies and research
543.470
Operation, maintenance and repair of improvements.
543.480
Contracts
543.490
Borrowing money
543.500
Acquisition and disposal of and encumbrances on property.
543.510
Appointment and powers of chief engineer and general manager
543.520
Bylaws.
543.530
Implied powers.
543.540
Agreements concerning projects for control of floods.
543.545
Exemption from requirements of public bidding for construction of certain flood control facilities
543.547
Compliance with master plan required for construction of flood control facility by local government
543.550
Rights-of-way across public lands granted to districts.
543.560
Acquisition of right to flood or interfere with property
543.570
Connection with storm water drain or flood control facility: Application
543.580
Chief engineer and general manager: Investigations, reports and estimates
543.590
Survey and report of problems
543.595
Adoption of uniform regulations
543.596
Further review of master plan at 5-year intervals.
543.597
Change of facility on or amendment of master plan
543.5955
Annual review of master plan
543.5965
More frequent review of master plan authorized
543.5975
Amendment of master plan for expenditure or provision of money to protect public or private property from flooding.
Last Updated

Feb. 5, 2021

§ 543.570’s source at nv​.us