NRS 534.250
Project for recharge, storage and recovery of water: Permit required

  • issuance, contents, modification and assignment of permit
  • monitoring requirements.

1.

Any person desiring to operate a project must first make an application to, and obtain from, the State Engineer a permit to operate such a project.

2.

The State Engineer shall, upon application, issue a permit to operate a project if the State Engineer determines that:

(a)

The applicant has the technical and financial capability to construct and operate a project.

(b)

The applicant has a right to use the proposed source of water for recharge pursuant to an approved appropriation consistent with this chapter and chapter 533 of NRS. Any determination made by the State Engineer for purposes of this paragraph is not binding in any other proceeding.

(c)

The project is hydrologically feasible.

(d)

If the project is in an area of active management, the project is consistent with the program of augmentation for that area.

(e)

The project will not cause harm to users of land or other water within the area of hydrologic effect of the project.

3.

The holder of a permit may apply to the State Engineer for approval to assign the permit to another person. The State Engineer must approve the assignment if the person to whom the permit is to be assigned will meet the requirements of paragraphs (a) and (b) of subsection 2 when the assignment is completed.

4.

A permit for a project must include:

(a)

The name and mailing address of the person to whom the permit is issued.

(b)

The name of the area of active management, groundwater basin or groundwater sub-basin, as applicable, in which the project will be located.

(c)

The capacity and plan of operation of the project.

(d)

Any monitoring program required pursuant to subsection 5.

(e)

Any conditions which are imposed pursuant to this chapter or any regulation adopted pursuant thereto.

(f)

Any other information which the State Engineer deems necessary to include.

5.

The State Engineer shall require the holder of a permit to monitor the operation of the project and the effect of the project on users of land and other water within the area of hydrologic effect of the project. In determining any monitoring requirements, the State Engineer shall cooperate with all government entities which regulate or monitor, or both, the quality of water.

6.

The State Engineer, on his or her initiative or at the request of the holder of the permit, may modify the conditions of the permit if monitoring demonstrates that modifications are necessary. In determining whether modifications are necessary, the State Engineer shall consider uses of land or water which were not in existence when the permit was issued.

Source: Section 534.250 — Project for recharge, storage and recovery of water: Permit required; issuance, contents, modification and assignment of permit; monitoring requirements., https://www.­leg.­state.­nv.­us/NRS/NRS-534.­html#NRS534Sec250.

534.010
Definitions.
534.011
“Area of active management” defined.
534.012
“Artesian well” defined.
534.013
“Domestic use” and “domestic purposes” defined.
534.014
“Person” defined.
534.015
“Recharged water” defined.
534.016
“Stored water” defined.
534.017
“Well driller” defined.
534.020
Underground waters belong to public and are subject to appropriation for beneficial use
534.025
Removal of underground waters to alleviate hazards caused by secondary recharge is beneficial use.
534.030
Administration by State Engineer: Petition by appropriators in basin
534.035
Groundwater boards: Establishment
534.037
Groundwater management plan for basin designated as critical management area: Petition
534.040
Employment and compensation of well supervisor and assistants
534.050
Permit to appropriate water required before sinking well in designated groundwater basin
534.060
Conditions for sinking wells
534.065
Replacement well: Application to change place of diversion not required in certain circumstances
534.070
Waste of water from artesian well unlawful.
534.090
Forfeiture and abandonment of rights.
534.100
Recognition of existing water rights
534.0105
“Aquifer” defined.
534.110
Rules and regulations of State Engineer
534.0115
“Area of hydrologic effect” defined.
534.120
State Engineer authorized to make rules, regulations and orders when groundwater is being depleted in designated area
534.125
State Engineer to file notice related to temporary permit.
534.0125
“Augmentation” defined.
534.130
State Engineer, assistants and Artesian Well Supervisor authorized to enter premises to investigate and carry out duties.
534.0135
“Percolating waters” defined.
534.140
Well drillers: Annual licenses
534.141
Application for renewal of license must include certain information regarding state business license
534.142
Payment of child support: Statement by applicant for license to drill
534.144
Suspension of license for failure to pay child support or comply with certain subpoenas or warrants
534.0145
“Project” defined.
534.146
Application for license to include social security number of applicant.
534.150
Well Drillers’ Advisory Board: Appointment
534.0155
“Storage account” defined.
534.160
License required to drill well
534.0165
“Waste” defined.
534.170
Well driller to keep log and records
534.0175
“Well drilling” and “drilling a well” defined.
534.180
Applicability of chapter to wells used for domestic purposes
534.185
Waiver of certain requirements for domestic wells by State Engineer
534.190
Penalties.
534.193
Additional penalties.
534.195
Injunctive and other relief.
534.250
Project for recharge, storage and recovery of water: Permit required
534.260
Project for recharge, storage and recovery of water: Contents of application for permit.
534.270
Project for recharge, storage and recovery of water: Review of application for permit
534.280
Project for recharge, storage and recovery of water: Annual report to State Engineer.
534.290
Project for recharge, storage and recovery of water: Permit for recovery well
534.300
Project for recharge, storage and recovery of water: Storage account to be established
534.310
Project for recharge, storage and recovery of water: Annual fee for permit
534.320
Project for recharge, storage and recovery of water: Revocation or suspension of permit
534.330
Project for recharge, storage and recovery of water: Penalties.
534.340
Project for recharge, storage and recovery of water: Designation of areas of active management.
534.350
Requirements for certain public water system to receive credits for addition of new customers to system.
534.360
Water Rights Technical Support Account: Creation
534.1405
Well drillers: Petition for review of criminal history to obtain license
Last Updated

Feb. 5, 2021

§ 534.250’s source at nv​.us