NRS 533.425
Issuance and contents of certificate of appropriation

  • notice of provisions governing forfeiture and abandonment of rights to underground water.

1.

Except as otherwise provided in NRS 533.503, as soon as practicable after satisfactory proof has been made to the State Engineer that any application to appropriate water or any application for permission to change the place of diversion, manner or place of use of water already appropriated has been perfected in accordance with the provisions of this chapter, the State Engineer shall issue to the holder or holders of the permit a certificate setting forth:

(a)

The name of each holder of the permit.

(b)

The date, source, purpose and amount of appropriation.

(c)

If for irrigation, a description of the irrigated lands by legal subdivisions, when possible, to which the water is appurtenant.

(d)

The number of the permit under which the certificate is issued.

2.

If the water is appropriated from an underground source, the State Engineer shall issue with the certificate a notice of the provisions governing the forfeiture and abandonment of such water rights. The notice must set forth the provisions of NRS 534.090.

Source: Section 533.425 — Issuance and contents of certificate of appropriation; notice of provisions governing forfeiture and abandonment of rights to underground water., https://www.­leg.­state.­nv.­us/NRS/NRS-533.­html#NRS533Sec425.

533.324
“Water already appropriated” defined.
533.325
Application to State Engineer for permit.
533.330
Application limited to water of one source for one purpose
533.335
Application for permit to appropriate water: Contents.
533.340
Additional requirements for contents of applications to appropriate water for certain specific uses.
533.345
Application for permit to change place of diversion, manner of use or place of use: Contents
533.350
Applications to be accompanied by maps, drawings and other data.
533.353
Application to appropriate water for beneficial use: Participation of county in development and implementation of monitoring, management and mitigation plan.
533.355
Receipt of application
533.357
Priority among applications to appropriate underground water for irrigation purposes from same basin.
533.360
Notice of application: Contents
533.363
State Engineer to notify county commissioners of application to use water in county other than that in which it is appropriated or currently diverted or used.
533.364
Certain interbasin transfers of groundwater
533.365
Procedure concerning verified protest filed by interested person against granting of application.
533.367
Requirement to ensure access of wildlife to water it customarily uses
533.368
Hydrological, environmental or other study: State Engineer to determine need for study
533.369
Special Account for Studies Concerning Water: Deposits
533.370
Approval or rejection of application by State Engineer: Conditions
533.371
Rejection of application for permit for specified period.
533.372
Approval or rejection of application to use water to generate energy for export.
533.375
State Engineer may require additional information before approval or rejection of application.
533.380
Time for completion of work and application of water to beneficial use
533.382
Form, acknowledgment and recording of conveyance.
533.383
Effect of recording or failing to record deed of conveyance.
533.384
Filings required by person to whom conveyance is made.
533.386
Duties of State Engineer concerning conveyances
533.387
Inapplicability of certain provisions to conveyance of shares of stock in ditch company.
533.390
Statement of work actually constructed
533.395
State Engineer may require proof of good faith and reasonable diligence
533.400
Verified statement to be filed with State Engineer by holder of permit within time set in endorsement on permit: Contents of statement
533.405
State Engineer may require map
533.410
Cancellation of permit for failure to file proof of application of water to beneficial use and accompanying map
533.415
State Engineer may refuse to file maps not conforming to statutory provisions or regulations.
533.420
Surveyor or engineer may be barred from practice before State Engineer for swearing falsely.
533.425
Issuance and contents of certificate of appropriation
533.430
Permits and certificates of appropriation subject to existing rights.
533.435
Fees of State Engineer
533.3703
Consideration of consumptive use of water right and proposed beneficial use of water.
533.3705
Limitation on initial quantity of water approved for application
Last Updated

Feb. 5, 2021

§ 533.425’s source at nv​.us