NRS 522.0828
Order for compulsory unitization: Findings required before issuance.
1.
The unitized management, operation and further development of a pool or portion thereof is reasonably necessary in order effectively to carry on pressure control, pressure-maintenance or repressuring operations, cycling operations, waterflooding operations, or any combination thereof, or any other form of joint effort calculated to substantially increase the ultimate recovery of oil and gas from the pool;2.
One or more of the unitized methods of operation as applied to the pool or portion thereof are feasible, will prevent waste and will, with reasonable probability, result in the increased recovery of substantially more oil and gas from the pool than would otherwise be recovered;3.
The estimated additional cost, if any, of conducting those operations will not exceed the value of the additional oil and gas so recovered; and4.
The unitization and adoption of one or more of the unitized methods of operation is for the common good and will result in the general advantage of the owners of the oil and gas rights within the pool or the portion thereof directly affected,
Source:
Section 522.0828 — Order for compulsory unitization: Findings required before issuance., https://www.leg.state.nv.us/NRS/NRS-522.html#NRS522Sec0828
.