NRS 338.169
Public body authorized to construct public work by selecting and entering into contracts with construction manager at risk

  • limitations.

1.

Subject to the provisions of subsection 2, a public body may construct a public work by:

(a)

Selecting a construction manager at risk pursuant to the provisions of NRS 338.1691 to 338.1696, inclusive; and

(b)

Entering into separate contracts with a construction manager at risk:

(1)

For preconstruction services, including, without limitation:
(I) Assisting the public body in determining whether scheduling or constructability problems exist that would delay the construction of the public work;
(II) Estimating the cost of the labor and material for the public work; and
(III) Assisting the public body in determining whether the public work can be constructed within the public body’s budget; and

(2)

To construct the public work.

2.

A public body in a county whose population is less than 100,000 may enter into contracts with a construction manager at risk pursuant to NRS 338.1685 to 338.16995, inclusive, for the construction of not more than two public works in a calendar year that are discrete projects.

Source: Section 338.169 — Public body authorized to construct public work by selecting and entering into contracts with construction manager at risk; limitations., https://www.­leg.­state.­nv.­us/NRS/NRS-338.­html#NRS338Sec169.

Last Updated

Jun. 24, 2021

§ 338.169’s source at nv​.us